How to bill project work — contracts, milestones, fees

Audience: admin (billing setup and runs are an admin + bookkeeper surface). Project leads benefit from knowing where their phase money stands. Clients see only issued invoices.

A ticket traces work to a client. But rollout projects and migrations live in Projects — and until now, project work that skipped tickets had no path to an invoice. This lesson covers the four seams that close that gap: link a project to the contract it bills through, set a phase budget and watch its burn, release a milestone (or a fixed-fee phase) into the invoice run, and log project time without a ticket detour. The seeded demo org already carries a working example: the Acme Network Refresh project bills through contract CT-1001, its completed Discovery phase holds a staged $1,200 release, and its Implementation phase burns against a $1,500 budget.

A linked project bills through its contract: the contract's rate card prices approved phase time, and the contract's invoice runs carry the project's releases. Open a project and set Billing contract (or PATCH /api/projects/{id} with billing_contract_id). One rule applies: the contract must belong to the same client as the project. An Acme project cannot bill through a Northwind agreement, and the API refuses the link rather than silently mis-billing someone.

Leaving the field empty keeps the project non-billable — internal work, fixed-price retainers you handle outside the system, anything that should never appear on an invoice run. The link prices nothing by itself. Money moves when a release is staged or approved time lands.

2. Set a phase budget and read the burn

For time-and-materials phases, set the contracted budget on the phase: Create phase or Edit phase, then budget_minor + budget_currency (or fee_minor + fee_currency for a fixed-fee phase, below). The budget is the denominator for the burn read model.

GET /api/projects/{id}/phase-burn returns one row per phase:

  • consumed_minutes and consumed_minor — approved, billable entries scoped to the phase, priced at the linked contract's rate card.
  • budget_minor — what the client agreed the phase costs.
  • alert — none under 80%, warn at 80% or more, over at 100%.

A phase with no budget always reports none, on purpose: no budget is not a zero budget, and reporting over on a never-agreed number would invent a commitment nobody made. When a phase crosses into warn, the honest responses are a change order, a client conversation, or an accepted loss — the number tells you which conversation to have.

3. Release milestones into the run

A completed milestone phase with an amount (the existing milestone_amount_minor on the phase) doesn't wait for anyone to remember it. Completion stages a release — one ledger row carrying the phase's name and amount, dated the day it completed. You can inspect the ledger any time at GET /api/projects/{id}/billing-releases.

The first invoice run on the linked contract whose window covers the release date bills it as its own project_release line and flips the ledger row to billed with the invoice reference. A pending release bills on the next run. It never bills twice, because the run flips the ledger row in the same transaction that issues the invoice — a replayed completion event lands on an already-billed row and stays inert.

Corrections have one door: cancel a pending release (POST .../billing-releases/{id}/cancel) before it bills. A billed release is immutable, like every issued invoice — fix it through a credit note.

4. Release a fixed-fee phase

Not every phase is a milestone. A phase with fee_minor + fee_currency in its billing record releases that fee on completion, same ledger, same run behavior, same one-time guarantee. Milestone phases keep using their milestone amount. The fixed fee is for the phase that just costs what it costs whenever it's done.

5. Log project time without a ticket

Time entries normally require a ticket. Project-scoped entries relax exactly that: POST /api/time-entries with phase_id instead of ticket_id logs the entry straight onto a phase. Exactly one parent is allowed — an entry belongs to a ticket or to a phase, never both, never neither, and both the API and the database check it.

Approval works the same queue you already run. Project entries appear alongside ticket entries and bill the same way. Billing consumes them through the phase (the burn read model above), so a project entry pays without anyone spinning up a ticket to carry it.

What this does not do

No per-phase rate cards: phases price through the linked contract's card, full stop. No automatic phase completion on burn-out: a budget exhausting is a documented, alerted fact, and a phase completing is a human decision. And no currency mixing across a run — a project whose releases are in a different currency than its contract bills in a separate run window, same as any other mixed-currency situation.